Projects
We've been busy supporting clients like you. Below is a sample of some of the project work we've recently completed. Get in contact to see if we can provide an alternate approach and support for your upcoming project.
Thunderbox Gold Plant, WA
$10M Capex
Capital Projects
- Operational support via dedicated site enigneer
- Concept studies & capex estimates
- Detailed multidiscipline engineering & design
Projects Include
- Trash Screen Duplication
- Quicklime system upgrade
- Conveyor dust control
- Chute upgrades
- Drive-in Sumps
- Pump upgrades
Pilgangoora Lithium P680, WA
$25M Capex
- Primary & Oversize Crushing
- Oversize Screening
- Secondary Crushing
- Air Services
Process Plant engineering activity includes;
- Design Management,
- Detail Design
- Civil, Structural, Mechanical, Piping
Subcontract
Pilgangoora Lithium P1000, WA
$10M CAPEX
- HPGR Duplication
Process Plant engineering activity includes;
- Design Management,
- Detail Design
- Civil, Structural, Mechanical, Piping
Subcontract
XUXA LITHIUM, BRAZIL
$30M Capex
- Primary Crushing,
- Secondary & Tertiary Crushing
- Primary & Classification Screening
- Coarse Ore Bin
- Emergency Feeder & Reclaim
Process Plant engineering activity includes;
- Design Management,
- Detail Design
- Civil, Structural, Mechanical, Piping
Subcontract
Confidential Coal Project, NSW
CPP Design Upgrades
Replace original designed process vendor equipment with alternate vendor supply equipment and update multidiscipline design interfaces to suit.
- Process Slurry Pumps
- Coarse & Fine Coal Centrifuge
- Screens
- Feeders
- Cyclones
Subcontract
Maules Creek Coal - Heavy vehicle maintenance and CHPP upgrades
$5M CAPEX
- Pre and Post-award project recapitalisation drafting/layout support
- Owners Team construction and ramp-up drafting support
- MIA Heavy Vehicle Workshop - Design Coordination - Owners Team
- MIA Heavy Vehicle Wash Bay - Design Coordination - Owners Team
- Mine/Pit Development Civil Infrastructure
- CPP Crane Bay slab
- Flocculant access platforms & piping
- Rail Viaduct emergency egress platforms
Mount Thorley Warkworth - CHPP Process improvement upgrades
$10M Capex
- Sand Screens Upgrade Project.
- Desliming Screens Upgrade Project (Modules 1 & 2).
- Midsize Circuit Project.
- Clarified Water System Review.
- Structural Audit co-ordination.
Nui Phao Tungsten Mine, Vietnam - Process improvement upgrades
Supporting Site Project Team with layout and design drafting for the following sustaining capital projects;
- BSF Rougher Flotation
- Tungsten Surge Tank & Pumps.
- Tungsten Thickener
- Ore Sorting Crushing Plant
- Liquid Caustic Truck Unloading
- Copper Filtration Building
- NHTMC Laboratory & Workshop
Boggabri Coal - Heavy vehicle maintenance and CHPP upgrades
- New Administration Facility layout, staging, and design drafting.
- HV Workshop Tyre Jacking Bay Roof.
- HV Workshop Lube piping reticulation.
- HV Fuel Farm
- Stockpile Dozer & ROM Pad FEL Fuel Pads.
- ROM Bin and Apron slab access and remediation.
- Various sampler access platforms & Bin access stair towers
- Various site-wide wash-down slabs and drive-in sumps.
- Miscellaneous civil infrastructure.
Edernet Copper Mine, Mongolia - Wash Stage Project
Design Process was responsible for completing Engineering and Design Drafting for the Wash Stage Project at Erdenet Copper Mine.
Services supplied;
- Structural Engineering Design,
- Structural Design Drafting
- Mechanical Design Drafting
- Piping Design Drafting
Vickery Expansion Project
- EIS Preparation Drafting Support.
- Project visualisation/3D Modelling for community & stakeholder consultation.
- Conceptual project development & planning (PFDs/Layouts).