desliming screens upgrade (Modules 1 & 2)
CLIENT
Yancoal - Mount Thorley Warkworth South CHPP
Services Provided
- Concept Design
- Brownfield 3d Digital Scan
- Structural Engineering
- Mechanical Engineering
- Electrical & Instrumentation Engineering
- Piping Engineering
- Multi-discipline detail design & drafting
Project Brief
Replace 8 existing low head Desliming Screens across two modules with 4 Multi-slope (Banana) Screens. The new screens installation (duplicated for each module) includes;
- A new desliming screen distribution box per module,
- Screen feed box per screen, and
- Asymmetric under-pans & discharge chutes to tie into existing plant infrastructure, and
- Cast-basalt piping.
This was supported with a new screen support and access structure for each new screens and screen drive motors, feed boxes, and distributor, along with platform infills covering under-pan penetrations from the removed outer screens.
The project scope also included a structural vibration analysis audit and review of the existing structure.
View on LinkedIn
Click on images below to view some project photo's.
Module 1
Existing Install to be demolished
Module 2
Existing Install to be demolished
Develop concept and detailed engineering models and drawings
Develop concept and detailed engineering models and drawings
Develop concept and detailed engineering models and drawings
1st Desliming Screen in transit
Desliming Screen install
Module 2
Installed
Module 1
Commissioned
Module 2
Commissioned
Module 2 Progression
Content from Vimeo can't be displayed due to your current cookie settings. To show this content, please click "Consent & Show" to confirm that necessary data will be transferred to Vimeo to enable this service. Further information can be found in our Privacy Policy. Changed your mind? You can revoke your consent at any time via your cookie settings.